Build X Design | Side-by-Side Laneway Suites
Two Laneway Suites, Now Under Construction.
The lot already held two triplexes, and this investor-owned project adds two self-contained laneway suites behind them. Each one runs two storeys, about 80 square metres, with three bedrooms and two and a half baths. Construction is underway now, with completion targeted for spring 2027.